DENIOS Ltd
Audley Ave Enterprise Park
Nova House, Suite 1
Newport, Shropshire
TF10 7DW

Tel.: +44 1952 811991
Email: info@denios.co.uk
Internet: www.denios.co.uk

Case Studies

Case Study

Air-conditioning work table for BECOM GmbH from Austria

BECOM GmbH from Austria manufactures electromechanical assemblies. When cleaning small parts, inflammatory acetone vapors are produced which should protect the employees. A DENIOS cleaning table with pollutant detection ensured more safety.

Read more
Case Study

Mixing station in the middle of the APO GmbH production halls

The APO GmbH from Germany deals with the coating of industrial mass small parts. To protect employees against harmful coatings, DENIOS constructed a transfer and mixing station, which at the same time ensured fire-protected storage.

Read more
Case Study

Battery test laboratory at Phoenix testlab

DENIOS produced a system that could simulate five different test conditions for testing lithium-ion batteries. The fire protection system provided protection for the employees and effectively designed entire process chains.

Read more
Case Study

Test bench for stationary energy storage

Voltavision GmbH is a research and development service provider that operates test facilities. The company needed a separate fire section. In cooperation with DENIOS, an F90 climate container was built that could prevent all possible risks as a preventative measure.

Read more
Case Study

Heating chambers with high capacities and short warm-up times

A specialty chemicals manufacturer from Wesel needed six heat chambers to store different substances with different properties safely. Explosion-proof roller doors ensured safety and space gain.

Read more
Case Study

Temperature controlled storage in water-protection area

UPPC GmbH produces epoxy resins and adhesives. Since the company is located in a water protection area, the thermal chambers had to have collecting basins so that chemicals could not get into the environment in an emergency. DENIOS storage solutions offered maximum protection for employees and the environment.

Read more
Case Study

Heated chambers for the desert

The airline company Qatar Airways has emergency slips like any other airline. These are exposed to great temperature fluctuations. Therefore, DENIOS climatic chambers were tested for possible deviations of the material. The DENIOS product thus contributed actively to the flight safety of the desert state.

Read more
Case Study

Optimal protection for employees at Covestro AG

In the handling of chemical raw materials in the powdery or dusty state, increased safety requirements apply to the design of workplaces to protect employees. Covestro AG chose DENIOS to implement the project.

Read more
Case Study

Showroom in the area of renewable energies for Hoppecke

HOPPECKE is a company that manufactures energy storage systems and industrial batteries. For exhibition purposes, the company needed a fire and explosion-proof container in which modern battery storage technologies could be stored and demonstrated.

Read more
Case Study

Heating up to 18,000 litres on just 15 square metres

An essential part of the manufacturing process of mold release agents and release agents is the temperature-controlled liquefaction of raw materials for further processing. For this purpose, our customer needed a tailor-made heat chamber. The special challenge: the production area at the customer's site was almost completely exhausted and an extension was not possible. A heat chamber with a high capacity had therefore to be realized on the smallest of footprints.

Read more
Case Study

Hazardous goods warehouse for the University of Düsseldorf

For the University of Düsseldorf, DENIOS hazardous goods warehouse guarantees maximum safety in research with water-polluting and flammable liquids and substances.

Read more
Case Study

Melting time shortened and costs saved

Based on its longstanding industry knowledge and proven industry standard for heating chambers, DENIOS has developed an innovative, process-controlled system technology for a customer in the pharmaceutical industry. It precisely regulates the melting temperature of the substance being treated, which is achieved homogeneously and in the shortest possible time.

Read more
Case Study

Looking at the internal temperature values

Reliably recording core and circulating air temperatures during the production of castrol lubricant: thermotechnology solutions from DENIOS for bp.

Read more
Case Study

Efficiently sized air-conditioning technology has a clear potential for savings

A Danish-based pharmaceutical company is a leader in the development of drugs for the treatment of severe neurological and neurodegenerative diseases. Suppliers are selected according to strict quality criteria and a high level of professionalism is required.

Read more
Case Study

Gas extraction system at INTEGA GmbH in Vietnam

INTEGA GmbH is a company in the field of ultrapure media supply. For a customer from Vietnam, INTEGA GmbH, together with DENIOS, manufactured two functional technical and safety rooms adapted to climatic conditions. All safety aspects were taken into account.

Read more
Case Study

Storage of lithium-ion batteries at the motorbike manufacturer KTM

KTM Sportmotorcycle AG from Austria manufactures motorcycles. For the storage of lithium-ion batteries, a hazardous materials store was required. Together with the battery manufacturer, DENIOS constructed a technical and security room that complied with all legal conditions.

Read more
Case Study

Storing Disinfectants in a Water Conservation Area

DENIOS develops customised solutions based on proven system containers for the storage of disinfectants in water protection area and creates safety.

Read more
Case Study

Storage of various hazardous substances for BASF in Ludwigshafen

As a leading chemical company, BASF already has extensive experience in handling hazardous substances. In order to further enhance the safety on the site, a turnkey container system was developed together with DENIOS, which meets all requirements for modern fire protection and fire detection technology.

Read more
Case Study

Storage of aerosols at the motorbike manufacturer KTM

The motorcycle manufacturer KTM from Austria had to supply compressed gas packs for the production. DENIOS developed a solution which not only corresponded to the warehouse requirements of the customer. The hazardous material storage also fulfills the stringent requirements of the Austrian Water Law.

Read more
Case Study

Paint mixing room in fire-rated storage container for Siemens

If working with paints and varnishes in production areas, employees have to be protected accordingly. For Industrial Turbomachinery in Sweden, Siemens needed a safe room solution for the storage and mixing of paints. In order to optimize logistical processes, the spatial proximity to other buildings should be guaranteed.

Read more
Case Study

Storage of chemical raw materials at Siemens in France

With the expansion of the production area at the French site in Haguenau, Siemens needed larger storage areas for the storage of chemical raw materials. DENIOS designed a flexible and mobile storage system, which could be set up centrally in production and meet all safety requirements.

Read more
Case Study

Printing ink bearings with fire and frost protection for Constantia Nusser GmbH

A printing ink bearing with fire and frost protection from DENIOS for Constania Nusser GmbH provides space for flammable printing inks and solvents in drums and IBCs.

Read more
Menu
Log in
Your basketAdded to basket
Go to basket
Enquire
*Required field

If you want to request more than one product, please use the shopping list function. Please also note our Data protection declaration .

This website is protected by reCAPTCHA and Google's privacy policy and terms of use apply.